无码AV无码免费一区二区,人妻久久久一区二区三区,成在人线av无码免费,另类尿喷潮videofree

Maintenance and operation of new valve before commissioning

Time:2021-01-22
Pre-maintenance of new valves before operation is a progressive construction concept to protect valve seat seals from seat damage during installation, welding and commissioning

Pre-maintenance of new valves before operation is a progressive construction concept to protect valve seat seals from seat damage during installation, welding and commissioning.The pre-maintenance of the valve before it is put into use can make it better realize the functions of conduction, truncation and diversion. It is not only conducive to early detection of problems, timely troubleshooting, eliminating hidden dangers, but also to extend the operation period of the pipeline, which can better provide a basis for the operation and maintenance of the valve after it is put into operation.

The valve leakage mostly occurs in the early use, the main reason is in the pipeline construction operation is not standard caused by the sealing ring and valve ball scratches, these scratches if not timely repair, long-term pipeline leakage operation will cause serious consequences, and the switch limit is not in place caused by the leakage, damage to the sealing ring is also very serious.

Seat sealing ring is an important component of the valve, which belongs to soft sealing, sealing materials include nylon, fluorine rubber and other chemical compounds, and its sealing form includes O ring or embedded two ways.Sealing ring no matter what kind of material and installation, can not avoid wear and scour and hard damage, resulting in valve leakage.Therefore, protecting the valve seat is the top priority in valve maintenance.

Once the valve cannot be opened and closed, the sealing device is damaged, serious internal leakage occurs, the grease nozzle is blocked or external leakage and other faults occur, it is difficult to eliminate in time under the condition of pipeline pressure, and it is necessary to deal with the pressure after relief, which not only affects the production period, but also causes the waste of human and material resources and pollution of the environment.Therefore, it is very important to maintain the valve before it is put into operation.


主站蜘蛛池模板: 吐鲁番市| 谷城县| 扶风县| 辽阳市| 永寿县| 西城区| 新密市| 集贤县| 无锡市| 前郭尔| 独山县| 隆化县| 西畴县| 龙泉市| 毕节市| 神池县| 赣州市| 保康县| 会理县| 三台县| 武宣县| 砚山县| 从化市| 务川| 九龙坡区| 巴青县| 龙门县| 鄱阳县| 杂多县| 北海市| 昔阳县| 安乡县| 清水河县| 含山县| 双辽市| 闵行区| 卢氏县| 崇左市| 许昌市| 灯塔市| 金昌市|